Transformer bushings Startup Checklist
Work scope & measurement context (optional record fields)
References only. This site supplies no acceptance values, test settings, intervals or release instructions. Selecting a scope does not authorize work. Use Remarks for row-specific context; refer to original files, which are not uploaded here.
Draft · technical review pending. Recording prompts only; not procedures or acceptance criteria. Work and access require your approved plan. No normal ranges, pass/fail values, test settings or maintenance intervals are supplied. Condition results are user-entered judgements under separately approved criteria. Evidence/task/measurement OK means the specified record is complete, not healthy equipment. This checklist does not authorize release to service. Unit selection does not convert values.
Research context & source scope
- USBR FIST technical library — Hydropower maintenance reference library; check edition and installation applicability.
These links do not validate every checkpoint. Technical approval pending; identify the exact applicable manual and work plan.
Archived V5 — read-only access to earlier saved records. No automatic migration. Export JSON or CSV for backup.
How to read this form
- Condition
- OK = User assessment under the referenced approved criteria.
- Measurement record
- OK = Required measurement record and context are complete.
- Evidence check
- OK = Required reference or evidence is verified.
- Task record
- OK = The specified recording task is complete.
- Blank / Pending / N/A
- Blank is unclassified. Pending identifies missing checks, evidence or criteria. N/A needs a reason in Remarks.
No row or completed form certifies safety, compliance or fitness for service.
Engineer/date/signature spaces remain for handwriting. Multiple records can be saved locally in this browser and exported; no cloud backup, file attachments or team approval is provided. Older template records stay separate and are not reinterpreted. Keep sensitive information off shared devices.
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 1 | Record equipment identity, subtype, model and installation locationTask record · OK = The specified recording task is complete | |||||
| 2 | Reference current drawings, manufacturer manual revision and approved startup scopeTask record · OK = The specified recording task is complete | |||||
| 3 | Record installation, shipping/storage and prior repair discrepanciesTask record · OK = The specified recording task is complete | |||||
| 4 | Reference approved work controls, responsible personnel and specialist scopeTask record · OK = The specified recording task is complete | |||||
| 5 | Record equipment-specific test methods and instrument/calibration referencesTask record · OK = The specified recording task is complete | |||||
| 6 | Identify fitted parts, exclusions and separately approved release requirementsTask record · OK = The specified recording task is complete |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 7 | Bushing identity and phase/location are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 8 | Porcelain/polymer surfaces show documented cracks, chips or contaminationEvidence check · OK = Required reference or evidence is verified | |||||
| 9 | Oil level indications, seals and flange leak observations are recorded where fittedEvidence check · OK = Required reference or evidence is verified | |||||
| 10 | Test tap cap/grounding and diagnostic report references are documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 11 | Approved bushing-specific diagnostic report; retain method and original units — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 12 | Installation/commissioning evidence for bushings: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 13 | Accessible insulation surfaces are checked for cracking and trackingCondition · OK = User assessment under the referenced approved criteria | |||||
| 14 | Moisture, contamination and discharge marks are documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 15 | Insulating barriers and separation discrepancies are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 16 | Insulation test reports identify connected equipment and test conditionsEvidence check · OK = Required reference or evidence is verified | |||||
| 17 | Approved equipment-specific insulation report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete | |||||
| 18 | Installation/commissioning evidence for insulation system: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 19 | Terminal and conductor identity match the reviewed connection drawingEvidence check · OK = Required reference or evidence is verified | |||||
| 20 | Discoloration, insulation damage and heat marks are recorded by terminalEvidence check · OK = Required reference or evidence is verified | |||||
| 21 | Conductor support, bend and strain-relief discrepancies are documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 22 | Approved torque/service evidence is referenced without inferring a torque valueEvidence check · OK = Required reference or evidence is verified | |||||
| 23 | Approved connection-resistance report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete | |||||
| 24 | Installation/commissioning evidence for power connections: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 25 | Fluid type, compartment and service record are identifiedEvidence check · OK = Required reference or evidence is verified | |||||
| 26 | Leak locations at seals, welds, valves and flanges are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 27 | Level indication is recorded with load/temperature contextEvidence check · OK = Required reference or evidence is verified | |||||
| 28 | Sampling and laboratory records preserve sample point, date and methodEvidence check · OK = Required reference or evidence is verified | |||||
| 29 | Oil temperature indication at the identified sensor; retain operating contextMeasurement record · OK = Required measurement record and context are complete | |||||
| 30 | Approved fluid laboratory report; retain original quantities and units — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 31 | Installation/commissioning evidence for insulating-fluid system: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 32 | Sensor model, location, measured quantity and calibration status are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 33 | Accessible mounting, wiring and environmental condition are documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 34 | Scaling and approved controller configuration references are retainedEvidence check · OK = Required reference or evidence is verified | |||||
| 35 | Sensor verification reports identify reference, method and installed contextEvidence check · OK = Required reference or evidence is verified | |||||
| 36 | Approved sensor verification report; retain quantity and units — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 37 | Installation/commissioning evidence for sensors & monitoring: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 38 | Protective earth and bonding conductor identification is recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 39 | Accessible bonds, clamps and joints show documented conditionEvidence check · OK = Required reference or evidence is verified | |||||
| 40 | Missing conductors, corrosion and mechanical damage are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 41 | Reviewed earth drawing and continuity measurement locations are referencedEvidence check · OK = Required reference or evidence is verified | |||||
| 42 | Approved bonding-continuity report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete | |||||
| 43 | Installation/commissioning evidence for grounding & bonding: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 44 | Attach original reports, photographs and manufacturer-document referencesTask record · OK = The specified recording task is complete | |||||
| 45 | Record units, method, conditions and instrument identity for each entered resultTask record · OK = The specified recording task is complete | |||||
| 46 | Explain excluded or inapplicable parts and missing evidenceTask record · OK = The specified recording task is complete | |||||
| 47 | Record discrepancies and assign follow-up owner and due-date referenceTask record · OK = The specified recording task is complete | |||||
| 48 | Record qualified review and separately authorized dispositionTask record · OK = The specified recording task is complete | |||||
| 49 | Reference restoration or release records; this checklist does not authorize releaseTask record · OK = The specified recording task is complete |
elecmaint.com · Template V5 · 49 checkpoints · No automatic condition assessment. OK does not certify safety or fitness for service. N/A requires an explanation; unknown/unverified items remain unclassified.