Work scope & measurement context (optional record fields)
References only. This site supplies no acceptance values, test settings, intervals or release instructions. Selecting a scope does not authorize work. Use Remarks for row-specific context; refer to original files, which are not uploaded here.
Draft · technical review pending. Recording prompts only; not procedures or acceptance criteria. Work and access require your approved plan. No normal ranges, pass/fail values, test settings or maintenance intervals are supplied. Condition results are user-entered judgements under separately approved criteria. Evidence/task/measurement OK means the specified record is complete, not healthy equipment. This checklist does not authorize release to service. Unit selection does not convert values.
Archived V5 — read-only access to earlier saved records. No automatic migration. Export JSON or CSV for backup.
How to read this form
- Condition
- OK = User assessment under the referenced approved criteria.
- Measurement record
- OK = Required measurement record and context are complete.
- Evidence check
- OK = Required reference or evidence is verified.
- Task record
- OK = The specified recording task is complete.
- Blank / Pending / N/A
- Blank is unclassified. Pending identifies missing checks, evidence or criteria. N/A needs a reason in Remarks.
No row or completed form certifies safety, compliance or fitness for service.
Engineer/date/signature spaces remain for handwriting. Multiple records can be saved locally in this browser and exported; no cloud backup, file attachments or team approval is provided. Older template records stay separate and are not reinterpreted. Keep sensitive information off shared devices.
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 1 | Record equipment identity, subtype, model and installation locationTask record · OK = The specified recording task is complete | |||||
| 2 | Reference current drawings, manufacturer manual revision and approved startup scopeTask record · OK = The specified recording task is complete | |||||
| 3 | Record installation, shipping/storage and prior repair discrepanciesTask record · OK = The specified recording task is complete | |||||
| 4 | Reference approved work controls, responsible personnel and specialist scopeTask record · OK = The specified recording task is complete | |||||
| 5 | Record equipment-specific test methods and instrument/calibration referencesTask record · OK = The specified recording task is complete | |||||
| 6 | Identify fitted parts, exclusions and separately approved release requirementsTask record · OK = The specified recording task is complete |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 7 | Capacitor bank/unit identity and ratings are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 8 | Bulging, leakage, damaged supports and heat marks are documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 9 | Fuse, switching and discharge circuit service evidence is referencedEvidence check · OK = Required reference or evidence is verified | |||||
| 10 | Capacitance/unbalance reports identify units and test configurationEvidence check · OK = Required reference or evidence is verified | |||||
| 11 | Capacitance result from the approved diagnostic reportMeasurement record · OK = Required measurement record and context are complete | |||||
| 12 | Approved capacitor-system measurement report; retain original units — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 13 | Installation/commissioning evidence for capacitor assemblies: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 14 | Reactor model, winding and phase identity are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 15 | Accessible supports, insulation and winding surfaces are documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 16 | Cooling, noise and overheating observations are retainedCondition · OK = User assessment under the referenced approved criteria | |||||
| 17 | Reactor diagnostic reports identify method and configurationEvidence check · OK = Required reference or evidence is verified | |||||
| 18 | Approved reactor-specific test report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 19 | Installation/commissioning evidence for reactors: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 20 | Fuse catalog number, voltage class and interrupting rating are transcribedCondition · OK = User assessment under the referenced approved criteria | |||||
| 21 | Holder, clip and contact condition are documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 22 | Replacement history and reviewed coordination reference are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 23 | Installed fuse discrepancies are recorded without selecting a substituteEvidence check · OK = Required reference or evidence is verified | |||||
| 24 | Fuse selection and circuit verification record — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 25 | Installation/commissioning evidence for fuses & holders: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 26 | OEM wear indicators and accessible contact condition are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 27 | Mechanism contamination, linkage and lubrication service evidence are documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 28 | Operating count and interrupted-fault records are retainedEvidence check · OK = Required reference or evidence is verified | |||||
| 29 | Contact resistance and timing reports identify poles and test configurationEvidence check · OK = Required reference or evidence is verified | |||||
| 30 | Approved contact-resistance report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete | |||||
| 31 | Installation/commissioning evidence for contacts & mechanism: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 32 | Protective device identity and approved settings revision are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 33 | Trip, alarm and interlock reports identify the functions actually testedEvidence check · OK = Required reference or evidence is verified | |||||
| 34 | Any inhibited function, override or temporary setting is documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 35 | Review/disposition references for protection discrepancies are retainedEvidence check · OK = Required reference or evidence is verified | |||||
| 36 | Approved protection and interlock verification report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 37 | Installation/commissioning evidence for protection & interlocks: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 38 | Protective earth and bonding conductor identification is recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 39 | Accessible bonds, clamps and joints show documented conditionEvidence check · OK = Required reference or evidence is verified | |||||
| 40 | Missing conductors, corrosion and mechanical damage are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 41 | Reviewed earth drawing and continuity measurement locations are referencedEvidence check · OK = Required reference or evidence is verified | |||||
| 42 | Approved bonding-continuity report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete | |||||
| 43 | Installation/commissioning evidence for grounding & bonding: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 44 | Attach original reports, photographs and manufacturer-document referencesTask record · OK = The specified recording task is complete | |||||
| 45 | Record units, method, conditions and instrument identity for each entered resultTask record · OK = The specified recording task is complete | |||||
| 46 | Explain excluded or inapplicable parts and missing evidenceTask record · OK = The specified recording task is complete | |||||
| 47 | Record discrepancies and assign follow-up owner and due-date referenceTask record · OK = The specified recording task is complete | |||||
| 48 | Record qualified review and separately authorized dispositionTask record · OK = The specified recording task is complete | |||||
| 49 | Reference restoration or release records; this checklist does not authorize releaseTask record · OK = The specified recording task is complete |