elecmaint.
elecmaint / equipment inspection record

Lightning protection systems Startup Checklist

FORM LIGHTNING-PROTECTION-STARTUP · V6
Engineer name
Date
Work scope & measurement context (optional record fields)

References only. This site supplies no acceptance values, test settings, intervals or release instructions. Selecting a scope does not authorize work. Use Remarks for row-specific context; refer to original files, which are not uploaded here.

Open V5 saved records (read-only)

Draft · technical review pending. Recording prompts only; not procedures or acceptance criteria. Work and access require your approved plan. No normal ranges, pass/fail values, test settings or maintenance intervals are supplied. Condition results are user-entered judgements under separately approved criteria. Evidence/task/measurement OK means the specified record is complete, not healthy equipment. This checklist does not authorize release to service. Unit selection does not convert values.

How to read this form

As-found observation
Describe what was observed. OK / Not OK are unavailable.
Condition
OK = User assessment under the referenced approved criteria.
Measurement record
OK = Required measurement record and context are complete.
Evidence check
OK = Required reference or evidence is verified.
Task record
OK = The specified recording task is complete.
Blank / Pending / N/A
Blank is unclassified. Pending identifies missing checks, evidence or criteria. N/A needs a reason in Remarks.

No row or completed form certifies safety, compliance or fitness for service.

Engineer/date/signature spaces remain for handwriting. Multiple records can be saved locally in this browser and exported; no cloud backup, file attachments or team approval is provided. Older template records stay separate and are not reinterpreted. Keep sensitive information off shared devices.

0 of 48 checkpoints recorded

Compare with an earlier saved inspection

Enter the same Equipment ID, Site and installed-asset identity / serial reference. Only the same template revision is compared. Context and units are shown without conversion or condition verdicts.

Records on hand & preparation

Record the documents and scope available for this inspection. Recording completion is not work authorization.

1
Record equipment identity, subtype, model and installation locationTask record · OK = The specified recording task is complete
2
Reference current drawings, manufacturer manual revision and approved startup scopeTask record · OK = The specified recording task is complete
3
Record installation, shipping/storage and prior repair discrepanciesTask record · OK = The specified recording task is complete
4
Reference approved work controls, responsible personnel and specialist scopeTask record · OK = The specified recording task is complete
5
Record equipment-specific test methods and instrument/calibration referencesTask record · OK = The specified recording task is complete
6
Identify fitted parts, exclusions and separately approved release requirementsTask record · OK = The specified recording task is complete
LIGHTNING INTERCEPTION
No.CheckpointValue / observationOKNot
OK
N/ARemarks
7Air terminals, down conductors and protected structure references are identifiedEvidence check · OK = Required reference or evidence is verified
8Accessible attachments, corrosion and damage are documentedEvidence check · OK = Required reference or evidence is verified
9Bonding connections and route changes are recordedEvidence check · OK = Required reference or evidence is verified
10Inspection/repair report references the reviewed lightning protection designEvidence check · OK = Required reference or evidence is verified
11Lightning-system inspection record — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
12Installation/commissioning evidence for lightning interception: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified
GROUND GRID
No.CheckpointValue / observationOKNot
OK
N/ARemarks
13Ground grid drawings and accessible test points are identifiedEvidence check · OK = Required reference or evidence is verified
14Accessible conductors, joints and corrosion condition are documentedEvidence check · OK = Required reference or evidence is verified
15Excavation, damage and installation change records are retainedEvidence check · OK = Required reference or evidence is verified
16Ground measurement report identifies method, geometry and environmental contextEvidence check · OK = Required reference or evidence is verified
17Approved ground-system measurement report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete
18Installation/commissioning evidence for ground grid: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified
GROUNDING & BONDING
No.CheckpointValue / observationOKNot
OK
N/ARemarks
19Protective earth and bonding conductor identification is recordedEvidence check · OK = Required reference or evidence is verified
20Accessible bonds, clamps and joints show documented conditionEvidence check · OK = Required reference or evidence is verified
21Missing conductors, corrosion and mechanical damage are recordedEvidence check · OK = Required reference or evidence is verified
22Reviewed earth drawing and continuity measurement locations are referencedEvidence check · OK = Required reference or evidence is verified
23Approved bonding-continuity report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete
24Installation/commissioning evidence for grounding & bonding: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified
SUPPORTS & TRAYS
No.CheckpointValue / observationOKNot
OK
N/ARemarks
25Tray/support type, loading reference and route are recordedEvidence check · OK = Required reference or evidence is verified
26Corrosion, loose attachments and displaced supports are documentedEvidence check · OK = Required reference or evidence is verified
27Sharp edges, cable abrasion and congestion observations are recordedEvidence check · OK = Required reference or evidence is verified
28Support modifications and bonding/fire-barrier interfaces are referencedEvidence check · OK = Required reference or evidence is verified
29Cable-support inspection and installation reference — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
30Installation/commissioning evidence for supports & trays: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified
POWER CONNECTIONS
No.CheckpointValue / observationOKNot
OK
N/ARemarks
31Terminal and conductor identity match the reviewed connection drawingEvidence check · OK = Required reference or evidence is verified
32Discoloration, insulation damage and heat marks are recorded by terminalEvidence check · OK = Required reference or evidence is verified
33Conductor support, bend and strain-relief discrepancies are documentedEvidence check · OK = Required reference or evidence is verified
34Approved torque/service evidence is referenced without inferring a torque valueEvidence check · OK = Required reference or evidence is verified
35Approved connection-resistance report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete
36Installation/commissioning evidence for power connections: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified
SURGE PROTECTIVE DEVICE
No.CheckpointValue / observationOKNot
OK
N/ARemarks
37SPD model, protective mode and connected system are recordedEvidence check · OK = Required reference or evidence is verified
38Status indicator, disconnector and accessible connections are documentedEvidence check · OK = Required reference or evidence is verified
39Bonding conductor routing and installation discrepancies are recordedEvidence check · OK = Required reference or evidence is verified
40Replacement/service references use the exact OEM model and reviewed instructionsEvidence check · OK = Required reference or evidence is verified
41SPD inspection record and manufacturer replacement criteria reference — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
42Installation/commissioning evidence for surge protective device: drawing/manual revision, as-installed configuration and unresolved punch-list referenceEvidence check · OK = Required reference or evidence is verified
REVIEW & FOLLOW-UP
No.CheckpointValue / observationOKNot
OK
N/ARemarks
43Attach original reports, photographs and manufacturer-document referencesTask record · OK = The specified recording task is complete
44Record units, method, conditions and instrument identity for each entered resultTask record · OK = The specified recording task is complete
45Explain excluded or inapplicable parts and missing evidenceTask record · OK = The specified recording task is complete
46Record discrepancies and assign follow-up owner and due-date referenceTask record · OK = The specified recording task is complete
47Record qualified review and separately authorized dispositionTask record · OK = The specified recording task is complete
48Reference restoration or release records; this checklist does not authorize releaseTask record · OK = The specified recording task is complete
Engineer signature
Reviewer / reference

elecmaint.com · Template V6 · 48 checkpoints · No automatic condition assessment. OK does not certify safety or fitness for service. N/A requires an explanation; unknown/unverified items remain unclassified.