Uninterruptible power supplies Maintenance Checklist
Work scope & measurement context (optional record fields)
References only. This site supplies no acceptance values, test settings, intervals or release instructions. Selecting a scope does not authorize work. Use Remarks for row-specific context; refer to original files, which are not uploaded here.
Draft · technical review pending. Recording prompts only; not procedures or acceptance criteria. Work and access require your approved plan. No normal ranges, pass/fail values, test settings or maintenance intervals are supplied. Condition results are user-entered judgements under separately approved criteria. Evidence/task/measurement OK means the specified record is complete, not healthy equipment. This checklist does not authorize release to service. Unit selection does not convert values.
Research context & source scope
- Eaton: UPS preventive-maintenance components — UPS component context; no interval or replacement criterion is transferred.
These links do not validate every checkpoint. Technical approval pending; identify the exact applicable manual and work plan.
How to read this form
- As-found observation
- Describe what was observed. OK / Not OK are unavailable.
- Condition
- OK = User assessment under the referenced approved criteria.
- Measurement record
- OK = Required measurement record and context are complete.
- Evidence check
- OK = Required reference or evidence is verified.
- Task record
- OK = The specified recording task is complete.
- Blank / Pending / N/A
- Blank is unclassified. Pending identifies missing checks, evidence or criteria. N/A needs a reason in Remarks.
No row or completed form certifies safety, compliance or fitness for service.
Engineer/date/signature spaces remain for handwriting. Multiple records can be saved locally in this browser and exported; no cloud backup, file attachments or team approval is provided. Older template records stay separate and are not reinterpreted. Keep sensitive information off shared devices.
Compare with an earlier saved inspection
Enter the same Equipment ID, Site and installed-asset identity / serial reference. Only the same template revision is compared. Context and units are shown without conversion or condition verdicts.
Records on hand & preparation
Record the documents and scope available for this inspection. Recording completion is not work authorization.
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 7 | Charger model, source and DC output circuit are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 8 | Approved charge mode/settings and firmware references are retainedEvidence check · OK = Required reference or evidence is verified | |||||
| 9 | Active charger/rectifier alarm codes at arrival — display or original report referenceAs-found observation · Description only | — | — | |||
| 10 | DC output/ripple reports identify load, charge state and measurement methodEvidence check · OK = Required reference or evidence is verified | |||||
| 11 | Approved charger output report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete | |||||
| 12 | Maintenance follow-up for charger & rectifier: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 13 | Inverter model, firmware and topology are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 14 | Power-module and DC-link capacitor service records are referencedEvidence check · OK = Required reference or evidence is verified | |||||
| 15 | Active inverter alarm codes at arrival — display or original report referenceAs-found observation · Description only | — | — | |||
| 16 | Output quality/functional reports identify load and operating modeEvidence check · OK = Required reference or evidence is verified | |||||
| 17 | Approved inverter functional report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 18 | Maintenance follow-up for inverter: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 19 | Static/maintenance bypass arrangement and source identity are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 20 | Bypass position indication as found — label, indicated position and observation sourceAs-found observation · Description only | — | — | |||
| 21 | Bypass/transfer interlock evidence is referencedEvidence check · OK = Required reference or evidence is verified | |||||
| 22 | Temporary bypass status and separately approved restoration records are retainedEvidence check · OK = Required reference or evidence is verified | |||||
| 23 | Approved bypass functional/interlock report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 24 | Maintenance follow-up for bypass system: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 25 | Battery chemistry, model, cell/block IDs and string are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 26 | As-found cell/block case swelling, cracks, leakage or corrosion — affected cell IDsAs-found observation · Description only | — | — | |||
| 27 | Accessible battery rack, spacing and interconnection appearance — affected locationsAs-found observation · Description only | — | — | |||
| 28 | Cell/block voltage records identify charging state and measurement pointEvidence check · OK = Required reference or evidence is verified | |||||
| 29 | Cell/block temperature at the identified location from the approved observation/report; retain charge/load stateMeasurement record · OK = Required measurement record and context are complete | |||||
| 30 | Approved cell-voltage report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete | |||||
| 31 | Maintenance follow-up for battery cells: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 32 | Terminal and conductor identity match the reviewed connection drawingEvidence check · OK = Required reference or evidence is verified | |||||
| 33 | Visible terminal discoloration, heat marks or insulation damage — terminal identificationAs-found observation · Description only | — | — | |||
| 34 | Accessible conductor support and strain-relief appearance — locationAs-found observation · Description only | — | — | |||
| 35 | Approved torque/service evidence is referenced without inferring a torque valueEvidence check · OK = Required reference or evidence is verified | |||||
| 36 | Approved connection-resistance report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete | |||||
| 37 | Maintenance follow-up for power connections: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 38 | Protective device identity and approved settings revision are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 39 | Trip, alarm and interlock reports identify the functions actually testedEvidence check · OK = Required reference or evidence is verified | |||||
| 40 | Any inhibited function, override or temporary setting is documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 41 | Review/disposition references for protection discrepancies are retainedEvidence check · OK = Required reference or evidence is verified | |||||
| 42 | Approved protection and interlock verification report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 43 | Maintenance follow-up for protection & interlocks: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 44 | As-found ventilation openings, filters and visible air-path obstructions — locationAs-found observation · Description only | — | — | |||
| 45 | Cooling fan operating indication at arrival; use Remarks for noise, damage and observation sourceAs-found observation · Description only | — | — | |||
| 46 | Cooling stage control and alarm evidence are referenced where fittedEvidence check · OK = Required reference or evidence is verified | |||||
| 47 | Ambient/load context and sensor location accompany temperature recordsEvidence check · OK = Required reference or evidence is verified | |||||
| 48 | Cooling-system temperature at the identified measurement locationMeasurement record · OK = Required measurement record and context are complete | |||||
| 49 | Cooling-system functional or temperature report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete | |||||
| 50 | Maintenance follow-up for cooling & ventilation: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 51 | Protective earth and bonding conductor identification is recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 52 | Accessible bonds, clamps and joints show documented conditionEvidence check · OK = Required reference or evidence is verified | |||||
| 53 | Missing conductors, corrosion and mechanical damage are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 54 | Reviewed earth drawing and continuity measurement locations are referencedEvidence check · OK = Required reference or evidence is verified | |||||
| 55 | Approved bonding-continuity report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete | |||||
| 56 | Maintenance follow-up for grounding & bonding: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 57 | Attach original reports, photographs and manufacturer-document referencesTask record · OK = The specified recording task is complete | |||||
| 58 | Record units, method, conditions and instrument identity for each entered resultTask record · OK = The specified recording task is complete | |||||
| 59 | Explain excluded or inapplicable parts and missing evidenceTask record · OK = The specified recording task is complete | |||||
| 60 | Record discrepancies and assign follow-up owner and due-date referenceTask record · OK = The specified recording task is complete | |||||
| 61 | Record qualified review and separately authorized dispositionTask record · OK = The specified recording task is complete | |||||
| 62 | Reference restoration or release records; this checklist does not authorize releaseTask record · OK = The specified recording task is complete |
elecmaint.com · Template V6 · 62 checkpoints · No automatic condition assessment. OK does not certify safety or fitness for service. N/A requires an explanation; unknown/unverified items remain unclassified.