Transformer bushings Maintenance Checklist

FORM TRANSFORMER-BUSHINGS-MAINTENANCE · V6
Engineer name
Date
Work scope & measurement context (optional record fields)

References only. This site supplies no acceptance values, test settings, intervals or release instructions. Selecting a scope does not authorize work. Use Remarks for row-specific context; refer to original files, which are not uploaded here.

Open V5 saved records (read-only)

Draft · technical review pending. Recording prompts only; not procedures or acceptance criteria. Work and access require your approved plan. No normal ranges, pass/fail values, test settings or maintenance intervals are supplied. Condition results are user-entered judgements under separately approved criteria. Evidence/task/measurement OK means the specified record is complete, not healthy equipment. This checklist does not authorize release to service. Unit selection does not convert values.

Research context & source scope

These links do not validate every checkpoint. Technical approval pending; identify the exact applicable manual and work plan.

How to read this form

As-found observation
Describe what was observed. OK / Not OK are unavailable.
Condition
OK = User assessment under the referenced approved criteria.
Measurement record
OK = Required measurement record and context are complete.
Evidence check
OK = Required reference or evidence is verified.
Task record
OK = The specified recording task is complete.
Blank / Pending / N/A
Blank is unclassified. Pending identifies missing checks, evidence or criteria. N/A needs a reason in Remarks.

No row or completed form certifies safety, compliance or fitness for service.

Engineer/date/signature spaces remain for handwriting. Multiple records can be saved locally in this browser and exported; no cloud backup, file attachments or team approval is provided. Older template records stay separate and are not reinterpreted. Keep sensitive information off shared devices.

0 of 49 checkpoints recorded

Compare with an earlier saved inspection

Enter the same Equipment ID, Site and installed-asset identity / serial reference. Only the same template revision is compared. Context and units are shown without conversion or condition verdicts.

Records on hand & preparation

Record the documents and scope available for this inspection. Recording completion is not work authorization.

1
Record equipment identity, subtype, model and maintenance scopeTask record · OK = The specified recording task is complete
2
Review previous inspection, repair and original test recordsTask record · OK = The specified recording task is complete
3
Record operating events, known defects and outstanding follow-upTask record · OK = The specified recording task is complete
4
Reference current manufacturer maintenance instructions and approved work controlsTask record · OK = The specified recording task is complete
5
Record approved methods and instrument/calibration references for planned testsTask record · OK = The specified recording task is complete
6
Identify fitted parts, maintenance exclusions and baseline comparison conditionsTask record · OK = The specified recording task is complete
BUSHINGS
No.CheckpointValue / observationOKNot
OK
N/ARemarks
7Bushing identity and phase/location are recordedEvidence check · OK = Required reference or evidence is verified
8Porcelain/polymer surfaces show documented cracks, chips or contaminationEvidence check · OK = Required reference or evidence is verified
9Oil level indications, seals and flange leak observations are recorded where fittedEvidence check · OK = Required reference or evidence is verified
10Test tap cap/grounding and diagnostic report references are documentedEvidence check · OK = Required reference or evidence is verified
11Approved bushing-specific diagnostic report; retain method and original units — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
12Maintenance follow-up for bushings: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
INSULATION SYSTEM
No.CheckpointValue / observationOKNot
OK
N/ARemarks
13Accessible insulation surfaces are checked for cracking and trackingCondition · OK = User assessment under the referenced approved criteria
14Moisture, contamination and discharge marks are documentedEvidence check · OK = Required reference or evidence is verified
15Insulating barriers and separation discrepancies are recordedEvidence check · OK = Required reference or evidence is verified
16Insulation test reports identify connected equipment and test conditionsEvidence check · OK = Required reference or evidence is verified
17Approved equipment-specific insulation report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete
18Maintenance follow-up for insulation system: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
POWER CONNECTIONS
No.CheckpointValue / observationOKNot
OK
N/ARemarks
19Terminal and conductor identity match the reviewed connection drawingEvidence check · OK = Required reference or evidence is verified
20Discoloration, insulation damage and heat marks are recorded by terminalEvidence check · OK = Required reference or evidence is verified
21Conductor support, bend and strain-relief discrepancies are documentedEvidence check · OK = Required reference or evidence is verified
22Approved torque/service evidence is referenced without inferring a torque valueEvidence check · OK = Required reference or evidence is verified
23Approved connection-resistance report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete
24Maintenance follow-up for power connections: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
INSULATING-FLUID SYSTEM
No.CheckpointValue / observationOKNot
OK
N/ARemarks
25Fluid type, compartment and service record are identifiedEvidence check · OK = Required reference or evidence is verified
26Leak locations at seals, welds, valves and flanges are recordedEvidence check · OK = Required reference or evidence is verified
27Level indication is recorded with load/temperature contextEvidence check · OK = Required reference or evidence is verified
28Sampling and laboratory records preserve sample point, date and methodEvidence check · OK = Required reference or evidence is verified
29Oil temperature indication at the identified sensor; retain operating contextMeasurement record · OK = Required measurement record and context are complete
30Approved fluid laboratory report; retain original quantities and units — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
31Maintenance follow-up for insulating-fluid system: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
SENSORS & MONITORING
No.CheckpointValue / observationOKNot
OK
N/ARemarks
32Sensor model, location, measured quantity and calibration status are recordedEvidence check · OK = Required reference or evidence is verified
33Accessible mounting, wiring and environmental condition are documentedEvidence check · OK = Required reference or evidence is verified
34Scaling and approved controller configuration references are retainedEvidence check · OK = Required reference or evidence is verified
35Sensor verification reports identify reference, method and installed contextEvidence check · OK = Required reference or evidence is verified
36Approved sensor verification report; retain quantity and units — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
37Maintenance follow-up for sensors & monitoring: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
GROUNDING & BONDING
No.CheckpointValue / observationOKNot
OK
N/ARemarks
38Protective earth and bonding conductor identification is recordedEvidence check · OK = Required reference or evidence is verified
39Accessible bonds, clamps and joints show documented conditionEvidence check · OK = Required reference or evidence is verified
40Missing conductors, corrosion and mechanical damage are recordedEvidence check · OK = Required reference or evidence is verified
41Reviewed earth drawing and continuity measurement locations are referencedEvidence check · OK = Required reference or evidence is verified
42Approved bonding-continuity report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete
43Maintenance follow-up for grounding & bonding: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
REVIEW & FOLLOW-UP
No.CheckpointValue / observationOKNot
OK
N/ARemarks
44Attach original reports, photographs and manufacturer-document referencesTask record · OK = The specified recording task is complete
45Record units, method, conditions and instrument identity for each entered resultTask record · OK = The specified recording task is complete
46Explain excluded or inapplicable parts and missing evidenceTask record · OK = The specified recording task is complete
47Record discrepancies and assign follow-up owner and due-date referenceTask record · OK = The specified recording task is complete
48Record qualified review and separately authorized dispositionTask record · OK = The specified recording task is complete
49Reference restoration or release records; this checklist does not authorize releaseTask record · OK = The specified recording task is complete
Engineer signature
Reviewer / reference

elecmaint.com · Template V6 · 49 checkpoints · No automatic condition assessment. OK does not certify safety or fitness for service. N/A requires an explanation; unknown/unverified items remain unclassified.