Gas-insulated switchgear (GIS) Maintenance Checklist

FORM GAS-INSULATED-SWITCHGEAR-MAINTENANCE · V6
Engineer name
Date
Work scope & measurement context (optional record fields)

References only. This site supplies no acceptance values, test settings, intervals or release instructions. Selecting a scope does not authorize work. Use Remarks for row-specific context; refer to original files, which are not uploaded here.

Open V5 saved records (read-only)

Draft · technical review pending. Recording prompts only; not procedures or acceptance criteria. Work and access require your approved plan. No normal ranges, pass/fail values, test settings or maintenance intervals are supplied. Condition results are user-entered judgements under separately approved criteria. Evidence/task/measurement OK means the specified record is complete, not healthy equipment. This checklist does not authorize release to service. Unit selection does not convert values.

How to read this form

As-found observation
Describe what was observed. OK / Not OK are unavailable.
Condition
OK = User assessment under the referenced approved criteria.
Measurement record
OK = Required measurement record and context are complete.
Evidence check
OK = Required reference or evidence is verified.
Task record
OK = The specified recording task is complete.
Blank / Pending / N/A
Blank is unclassified. Pending identifies missing checks, evidence or criteria. N/A needs a reason in Remarks.

No row or completed form certifies safety, compliance or fitness for service.

Engineer/date/signature spaces remain for handwriting. Multiple records can be saved locally in this browser and exported; no cloud backup, file attachments or team approval is provided. Older template records stay separate and are not reinterpreted. Keep sensitive information off shared devices.

0 of 50 checkpoints recorded

Compare with an earlier saved inspection

Enter the same Equipment ID, Site and installed-asset identity / serial reference. Only the same template revision is compared. Context and units are shown without conversion or condition verdicts.

Records on hand & preparation

Record the documents and scope available for this inspection. Recording completion is not work authorization.

1
Record equipment identity, subtype, model and maintenance scopeTask record · OK = The specified recording task is complete
2
Review previous inspection, repair and original test recordsTask record · OK = The specified recording task is complete
3
Record operating events, known defects and outstanding follow-upTask record · OK = The specified recording task is complete
4
Reference current manufacturer maintenance instructions and approved work controlsTask record · OK = The specified recording task is complete
5
Record approved methods and instrument/calibration references for planned testsTask record · OK = The specified recording task is complete
6
Identify fitted parts, maintenance exclusions and baseline comparison conditionsTask record · OK = The specified recording task is complete
GAS SYSTEM
No.CheckpointValue / observationOKNot
OK
N/ARemarks
7Gas type, compartment and density monitor identity are recordedEvidence check · OK = Required reference or evidence is verified
8Density/pressure indication is recorded with the OEM temperature contextEvidence check · OK = Required reference or evidence is verified
9Leak alarms and gas service history are documentedEvidence check · OK = Required reference or evidence is verified
10Gas quality/recovery records identify method and compartmentEvidence check · OK = Required reference or evidence is verified
11Gas density/pressure indication from the identified monitor; retain temperature contextMeasurement record · OK = Required measurement record and context are complete
12Approved gas-system service report; retain gas type and source units — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
13Maintenance follow-up for gas system: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
BUSBARS
No.CheckpointValue / observationOKNot
OK
N/ARemarks
14Bus section, phase labels and connection identity are recordedEvidence check · OK = Required reference or evidence is verified
15Insulating supports, barriers and accessible surfaces are documentedEvidence check · OK = Required reference or evidence is verified
16Joint heating/discoloration and mechanical displacement are recordedEvidence check · OK = Required reference or evidence is verified
17Thermal/contact resistance records identify section and operating/test contextEvidence check · OK = Required reference or evidence is verified
18Approved bus connection or thermal inspection report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
19Maintenance follow-up for busbars: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
INTERRUPTER ASSEMBLY
No.CheckpointValue / observationOKNot
OK
N/ARemarks
20Interrupter technology, pole and serial identity are recordedEvidence check · OK = Required reference or evidence is verified
21Accessible housing, bellows or chamber condition is documented as applicableEvidence check · OK = Required reference or evidence is verified
22Operation/fault history and OEM wear indicators are recordedEvidence check · OK = Required reference or evidence is verified
23Interrupter integrity verification report identifies the approved methodEvidence check · OK = Required reference or evidence is verified
24Arc chute/grid condition and exact OEM service/replacement record, only where fitted and accessible within the approved scopeEvidence check · OK = Required reference or evidence is verified
25Approved interrupter-specific verification report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
26Maintenance follow-up for interrupter assembly: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
TRIP & CLOSE CIRCUITS
No.CheckpointValue / observationOKNot
OK
N/ARemarks
27Trip/close coil and control voltage identity are recordedEvidence check · OK = Required reference or evidence is verified
28Control wiring, terminal and fuse condition are documentedEvidence check · OK = Required reference or evidence is verified
29Trip circuit supervision and alarm evidence is referencedEvidence check · OK = Required reference or evidence is verified
30Approved trip/close operation report identifies source and control modesEvidence check · OK = Required reference or evidence is verified
31Approved trip/close circuit functional report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
32Maintenance follow-up for trip & close circuits: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
PROTECTION & INTERLOCKS
No.CheckpointValue / observationOKNot
OK
N/ARemarks
33Protective device identity and approved settings revision are recordedEvidence check · OK = Required reference or evidence is verified
34Trip, alarm and interlock reports identify the functions actually testedEvidence check · OK = Required reference or evidence is verified
35Any inhibited function, override or temporary setting is documentedEvidence check · OK = Required reference or evidence is verified
36Review/disposition references for protection discrepancies are retainedEvidence check · OK = Required reference or evidence is verified
37Approved protection and interlock verification report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
38Maintenance follow-up for protection & interlocks: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
GROUNDING & BONDING
No.CheckpointValue / observationOKNot
OK
N/ARemarks
39Protective earth and bonding conductor identification is recordedEvidence check · OK = Required reference or evidence is verified
40Accessible bonds, clamps and joints show documented conditionEvidence check · OK = Required reference or evidence is verified
41Missing conductors, corrosion and mechanical damage are recordedEvidence check · OK = Required reference or evidence is verified
42Reviewed earth drawing and continuity measurement locations are referencedEvidence check · OK = Required reference or evidence is verified
43Approved bonding-continuity report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete
44Maintenance follow-up for grounding & bonding: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
REVIEW & FOLLOW-UP
No.CheckpointValue / observationOKNot
OK
N/ARemarks
45Attach original reports, photographs and manufacturer-document referencesTask record · OK = The specified recording task is complete
46Record units, method, conditions and instrument identity for each entered resultTask record · OK = The specified recording task is complete
47Explain excluded or inapplicable parts and missing evidenceTask record · OK = The specified recording task is complete
48Record discrepancies and assign follow-up owner and due-date referenceTask record · OK = The specified recording task is complete
49Record qualified review and separately authorized dispositionTask record · OK = The specified recording task is complete
50Reference restoration or release records; this checklist does not authorize releaseTask record · OK = The specified recording task is complete
Engineer signature
Reviewer / reference

elecmaint.com · Template V6 · 50 checkpoints · No automatic condition assessment. OK does not certify safety or fitness for service. N/A requires an explanation; unknown/unverified items remain unclassified.