Work scope & measurement context (optional record fields)

References only. This site supplies no acceptance values, test settings, intervals or release instructions. Selecting a scope does not authorize work. Use Remarks for row-specific context; refer to original files, which are not uploaded here.

Open V5 saved records (read-only)

Draft · technical review pending. Recording prompts only; not procedures or acceptance criteria. Work and access require your approved plan. No normal ranges, pass/fail values, test settings or maintenance intervals are supplied. Condition results are user-entered judgements under separately approved criteria. Evidence/task/measurement OK means the specified record is complete, not healthy equipment. This checklist does not authorize release to service. Unit selection does not convert values.

Research context & source scope

These links do not validate every checkpoint. Technical approval pending; identify the exact applicable manual and work plan.

How to read this form

As-found observation
Describe what was observed. OK / Not OK are unavailable.
Condition
OK = User assessment under the referenced approved criteria.
Measurement record
OK = Required measurement record and context are complete.
Evidence check
OK = Required reference or evidence is verified.
Task record
OK = The specified recording task is complete.
Blank / Pending / N/A
Blank is unclassified. Pending identifies missing checks, evidence or criteria. N/A needs a reason in Remarks.

No row or completed form certifies safety, compliance or fitness for service.

Engineer/date/signature spaces remain for handwriting. Multiple records can be saved locally in this browser and exported; no cloud backup, file attachments or team approval is provided. Older template records stay separate and are not reinterpreted. Keep sensitive information off shared devices.

0 of 50 checkpoints recorded

Compare with an earlier saved inspection

Enter the same Equipment ID, Site and installed-asset identity / serial reference. Only the same template revision is compared. Context and units are shown without conversion or condition verdicts.

Records on hand & preparation

Record the documents and scope available for this inspection. Recording completion is not work authorization.

1
Record equipment identity, subtype, model and maintenance scopeTask record · OK = The specified recording task is complete
2
Review previous inspection, repair and original test recordsTask record · OK = The specified recording task is complete
3
Record operating events, known defects and outstanding follow-upTask record · OK = The specified recording task is complete
4
Reference current manufacturer maintenance instructions and approved work controlsTask record · OK = The specified recording task is complete
5
Record approved methods and instrument/calibration references for planned testsTask record · OK = The specified recording task is complete
6
Identify fitted parts, maintenance exclusions and baseline comparison conditionsTask record · OK = The specified recording task is complete
ENCLOSURE & STRUCTURE
No.CheckpointValue / observationOKNot
OK
N/ARemarks
7Corrosion, coating damage and impact marks are recorded by locationEvidence check · OK = Required reference or evidence is verified
8Door seals, latches, hinges and covers have documented conditionEvidence check · OK = Required reference or evidence is verified
9Water ingress, condensation and contamination evidence are recordedEvidence check · OK = Required reference or evidence is verified
10Mounting, anchoring and accessible structural supports are documentedEvidence check · OK = Required reference or evidence is verified
11Enclosure inspection and ingress-control record — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
12Maintenance follow-up for enclosure & structure: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
WINDINGS
No.CheckpointValue / observationOKNot
OK
N/ARemarks
13Winding and phase identification match the reviewed nameplate/drawingEvidence check · OK = Required reference or evidence is verified
14Accessible winding insulation and lead support condition are documentedEvidence check · OK = Required reference or evidence is verified
15Winding thermal or overload event history is recordedEvidence check · OK = Required reference or evidence is verified
16Test reports identify tap, winding pair, temperature and instrumentEvidence check · OK = Required reference or evidence is verified
17Approved winding-resistance report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete
18Maintenance follow-up for windings: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
INSULATING-FLUID SYSTEM
No.CheckpointValue / observationOKNot
OK
N/ARemarks
19Fluid type, compartment and service record are identifiedEvidence check · OK = Required reference or evidence is verified
20Leak locations at seals, welds, valves and flanges are recordedEvidence check · OK = Required reference or evidence is verified
21Level indication is recorded with load/temperature contextEvidence check · OK = Required reference or evidence is verified
22Sampling and laboratory records preserve sample point, date and methodEvidence check · OK = Required reference or evidence is verified
23Oil temperature indication at the identified sensor; retain operating contextMeasurement record · OK = Required measurement record and context are complete
24Approved fluid laboratory report; retain original quantities and units — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
25Maintenance follow-up for insulating-fluid system: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
TAP CHANGER
No.CheckpointValue / observationOKNot
OK
N/ARemarks
26Tap changer model, position and operation count are recordedEvidence check · OK = Required reference or evidence is verified
27Drive cabinet, linkage and position indication condition are documentedEvidence check · OK = Required reference or evidence is verified
28Separate oil compartment and filter records are referenced where fittedEvidence check · OK = Required reference or evidence is verified
29Limit, interlock and tap position verification reports are attachedEvidence check · OK = Required reference or evidence is verified
30Tap operation counter reading from the identified mechanismMeasurement record · OK = Required measurement record and context are complete
31Approved tap-position and mechanism verification report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
32Maintenance follow-up for tap changer: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
NEUTRAL CONNECTIONS
No.CheckpointValue / observationOKNot
OK
N/ARemarks
33Neutral connection and grounding arrangement match reviewed drawingsEvidence check · OK = Required reference or evidence is verified
34Neutral conductor identification and support condition are documentedEvidence check · OK = Required reference or evidence is verified
35Neutral bonds and accessible connections are inspected within scopeEvidence check · OK = Required reference or evidence is verified
36Changes to neutral arrangement and associated study review are recordedEvidence check · OK = Required reference or evidence is verified
37Approved neutral-circuit inspection or test report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified
38Maintenance follow-up for neutral connections: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
GROUNDING & BONDING
No.CheckpointValue / observationOKNot
OK
N/ARemarks
39Protective earth and bonding conductor identification is recordedEvidence check · OK = Required reference or evidence is verified
40Accessible bonds, clamps and joints show documented conditionEvidence check · OK = Required reference or evidence is verified
41Missing conductors, corrosion and mechanical damage are recordedEvidence check · OK = Required reference or evidence is verified
42Reviewed earth drawing and continuity measurement locations are referencedEvidence check · OK = Required reference or evidence is verified
43Approved bonding-continuity report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete
44Maintenance follow-up for grounding & bonding: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified
REVIEW & FOLLOW-UP
No.CheckpointValue / observationOKNot
OK
N/ARemarks
45Attach original reports, photographs and manufacturer-document referencesTask record · OK = The specified recording task is complete
46Record units, method, conditions and instrument identity for each entered resultTask record · OK = The specified recording task is complete
47Explain excluded or inapplicable parts and missing evidenceTask record · OK = The specified recording task is complete
48Record discrepancies and assign follow-up owner and due-date referenceTask record · OK = The specified recording task is complete
49Record qualified review and separately authorized dispositionTask record · OK = The specified recording task is complete
50Reference restoration or release records; this checklist does not authorize releaseTask record · OK = The specified recording task is complete
Engineer signature
Reviewer / reference

elecmaint.com · Template V6 · 50 checkpoints · No automatic condition assessment. OK does not certify safety or fitness for service. N/A requires an explanation; unknown/unverified items remain unclassified.