Autotransformers Maintenance Checklist
Work scope & measurement context (optional record fields)
References only. This site supplies no acceptance values, test settings, intervals or release instructions. Selecting a scope does not authorize work. Use Remarks for row-specific context; refer to original files, which are not uploaded here.
Draft · technical review pending. Recording prompts only; not procedures or acceptance criteria. Work and access require your approved plan. No normal ranges, pass/fail values, test settings or maintenance intervals are supplied. Condition results are user-entered judgements under separately approved criteria. Evidence/task/measurement OK means the specified record is complete, not healthy equipment. This checklist does not authorize release to service. Unit selection does not convert values.
Research context & source scope
- USBR FIST technical library — Hydropower maintenance reference library; check edition and installation applicability.
These links do not validate every checkpoint. Technical approval pending; identify the exact applicable manual and work plan.
How to read this form
- As-found observation
- Describe what was observed. OK / Not OK are unavailable.
- Condition
- OK = User assessment under the referenced approved criteria.
- Measurement record
- OK = Required measurement record and context are complete.
- Evidence check
- OK = Required reference or evidence is verified.
- Task record
- OK = The specified recording task is complete.
- Blank / Pending / N/A
- Blank is unclassified. Pending identifies missing checks, evidence or criteria. N/A needs a reason in Remarks.
No row or completed form certifies safety, compliance or fitness for service.
Engineer/date/signature spaces remain for handwriting. Multiple records can be saved locally in this browser and exported; no cloud backup, file attachments or team approval is provided. Older template records stay separate and are not reinterpreted. Keep sensitive information off shared devices.
Compare with an earlier saved inspection
Enter the same Equipment ID, Site and installed-asset identity / serial reference. Only the same template revision is compared. Context and units are shown without conversion or condition verdicts.
Records on hand & preparation
Record the documents and scope available for this inspection. Recording completion is not work authorization.
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 7 | Corrosion, coating damage and impact marks are recorded by locationEvidence check · OK = Required reference or evidence is verified | |||||
| 8 | Door seals, latches, hinges and covers have documented conditionEvidence check · OK = Required reference or evidence is verified | |||||
| 9 | Water ingress, condensation and contamination evidence are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 10 | Mounting, anchoring and accessible structural supports are documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 11 | Enclosure inspection and ingress-control record — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 12 | Maintenance follow-up for enclosure & structure: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 13 | Winding and phase identification match the reviewed nameplate/drawingEvidence check · OK = Required reference or evidence is verified | |||||
| 14 | Accessible winding insulation and lead support condition are documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 15 | Winding thermal or overload event history is recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 16 | Test reports identify tap, winding pair, temperature and instrumentEvidence check · OK = Required reference or evidence is verified | |||||
| 17 | Approved winding-resistance report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete | |||||
| 18 | Maintenance follow-up for windings: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 19 | Fluid type, compartment and service record are identifiedEvidence check · OK = Required reference or evidence is verified | |||||
| 20 | Leak locations at seals, welds, valves and flanges are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 21 | Level indication is recorded with load/temperature contextEvidence check · OK = Required reference or evidence is verified | |||||
| 22 | Sampling and laboratory records preserve sample point, date and methodEvidence check · OK = Required reference or evidence is verified | |||||
| 23 | Oil temperature indication at the identified sensor; retain operating contextMeasurement record · OK = Required measurement record and context are complete | |||||
| 24 | Approved fluid laboratory report; retain original quantities and units — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 25 | Maintenance follow-up for insulating-fluid system: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 26 | Tap changer model, position and operation count are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 27 | Drive cabinet, linkage and position indication condition are documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 28 | Separate oil compartment and filter records are referenced where fittedEvidence check · OK = Required reference or evidence is verified | |||||
| 29 | Limit, interlock and tap position verification reports are attachedEvidence check · OK = Required reference or evidence is verified | |||||
| 30 | Tap operation counter reading from the identified mechanismMeasurement record · OK = Required measurement record and context are complete | |||||
| 31 | Approved tap-position and mechanism verification report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 32 | Maintenance follow-up for tap changer: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 33 | Neutral connection and grounding arrangement match reviewed drawingsEvidence check · OK = Required reference or evidence is verified | |||||
| 34 | Neutral conductor identification and support condition are documentedEvidence check · OK = Required reference or evidence is verified | |||||
| 35 | Neutral bonds and accessible connections are inspected within scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 36 | Changes to neutral arrangement and associated study review are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 37 | Approved neutral-circuit inspection or test report — attach the approved report with method, conditions and source reference; only if in scopeEvidence check · OK = Required reference or evidence is verified | |||||
| 38 | Maintenance follow-up for neutral connections: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 39 | Protective earth and bonding conductor identification is recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 40 | Accessible bonds, clamps and joints show documented conditionEvidence check · OK = Required reference or evidence is verified | |||||
| 41 | Missing conductors, corrosion and mechanical damage are recordedEvidence check · OK = Required reference or evidence is verified | |||||
| 42 | Reviewed earth drawing and continuity measurement locations are referencedEvidence check · OK = Required reference or evidence is verified | |||||
| 43 | Approved bonding-continuity report — attach the approved report with method, conditions and source reference; only if in scopeMeasurement record · OK = Required measurement record and context are complete | |||||
| 44 | Maintenance follow-up for grounding & bonding: change from baseline, service/replacement performed and unresolved defect referenceEvidence check · OK = Required reference or evidence is verified |
| No. | Checkpoint | Value / observation | OK | Not OK | N/A | Remarks |
|---|---|---|---|---|---|---|
| 45 | Attach original reports, photographs and manufacturer-document referencesTask record · OK = The specified recording task is complete | |||||
| 46 | Record units, method, conditions and instrument identity for each entered resultTask record · OK = The specified recording task is complete | |||||
| 47 | Explain excluded or inapplicable parts and missing evidenceTask record · OK = The specified recording task is complete | |||||
| 48 | Record discrepancies and assign follow-up owner and due-date referenceTask record · OK = The specified recording task is complete | |||||
| 49 | Record qualified review and separately authorized dispositionTask record · OK = The specified recording task is complete | |||||
| 50 | Reference restoration or release records; this checklist does not authorize releaseTask record · OK = The specified recording task is complete |
elecmaint.com · Template V6 · 50 checkpoints · No automatic condition assessment. OK does not certify safety or fitness for service. N/A requires an explanation; unknown/unverified items remain unclassified.